Name |
Nissan Avila
|
|
Country installed |
Spain
|
|
Address |
Avila
|
|
Industry sector, NACE code |
C29 - Manufacture of motor vehicles, trailers and semi-trailers
|
|
Solar thermal system owner / operator |
NISSAN
|
|
Solar thermal engineering company |
|
|
Process integration engineering company |
|
|
Year of operation start |
2007
|
|
|
Technical parameters |
|
|
Collector technology |
flat plate collector
|
|
Collector name |
GAMESA Solar 5000 ST
|
|
Installed collector area (gross), m² |
530.0
|
|
Installed collector area (aperture), m² |
|
|
Installed collector area (absorber), m² |
|
|
Installed thermal power (actual), kWth |
370.0
|
|
Solar collector loop heat transfer fluid |
|
|
Solar energy storage |
short-term water storage
|
|
Storage volume, m³ |
40
|
|
Kind of conventional heat source |
steam boiler
|
|
Kind of fuel used |
natural gas
|
|
|
Process |
|
|
Solar thermal energy used for |
bodyworks pre-treatment line, where are placed the pre-treatment for the grease removal and the phosphatizing and electrocoating processes
|
|
Unit operation |
surface treatment
|
|
Point of Solar Heat Integration |
C) Other integration points (please specify)
|
|
--> Integration how and where |
|
|
--> Temperature range process |
|
|
--> Temperature range solar loop (min/max), C° |
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
140,000.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
|
|
Others (excl. VAT), € |
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
140000
|
|
Cost for fuel replaced, €/MWhfuel |
32.58
|
|
Calculated solar thermal system life time, a |
|
|
Annual useful solar heat delivery, MWh/a |
480
|
|
Specific annual useful solar heat delivery, MWh/am² |
0.91
|
|
Specific investment costs, €/m² |
264.15
|
|
Solar fraction, % |
|
|
|
Lessons learned |
|
|
Initiative |
With this installation of solar heat, the company looked for fulfil the environmental
objectives contained in the Nissan Programme Green 2007 - 2010, which had three
main indicators: increase the residues recycled percentage, decrease the kgCO2/vehicle, and decrease the solvent kg/m2 of painted surface. In this case, the aim was to improve the emissions indicator "kgCO2/vehicle"
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
This type of installation shows the capacity of the solar heat to provide support to traditional NG systems, obtaining energy and economical saves without dispense with the installed systems.
|
|
Recommendations |
|
|
|
|
|
|
|
|
|
|