|
|
|
|
|
|
|
|
|
|
|
General information |
|
|
Name |
Kastrinogiannis S.A.
|
|
Country installed |
Greece
|
|
Address |
Iraklion, Crete
|
|
Industry sector, NACE code |
C13 - Manufacture of textiles
|
|
Solar thermal system owner / operator |
Kastrinogiannis S.A.
|
|
Solar thermal engineering company |
FOCO S.A.
|
|
Process integration engineering company |
Boyas Bros
|
|
Year of operation start |
1993
|
|
|
Technical parameters |
|
|
Collector technology |
flat plate collector
|
|
Collector name |
|
|
Installed collector area (gross), m² |
174.0
|
|
Installed collector area (aperture), m² |
|
|
Installed collector area (absorber), m² |
|
|
Installed thermal power (estimated), kWth |
121.8
(Default value calculated by multiplying the gross collector area by 0.7 kWth/m²)
|
|
Solar collector loop heat transfer fluid |
water
|
|
Solar energy storage |
|
|
Storage volume, m³ |
10.0
|
|
Kind of conventional heat source |
|
|
Kind of fuel used |
|
|
|
Process |
|
|
Solar thermal energy used for |
Hot water directly for dying machines, and hot water to feed the boiler
|
|
Unit operation |
bleaching
|
|
Point of Solar Heat Integration |
C) Other integration points (please specify)
|
|
--> Integration how and where |
|
|
--> Temperature range process |
40 - 90
|
|
--> Temperature range solar loop (min/max), C° |
27 - 63
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
23,142.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
|
|
Others (excl. VAT), € |
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
no subsidies
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
0
|
|
Annual useful solar heat delivery, MWh/a |
|
|
Specific annual useful solar heat delivery, MWh/am² |
|
|
Specific investment costs, €/m² |
133.0
|
|
Solar fraction, % |
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
|
|
Recommendations |
|
|
|
|
|
|
|
|
|
|