General information |
|
|
Name |
Gudong Oil Production Plant
|
|
Country installed |
China
|
|
Address |
Dongying City, Shandong Province
|
|
Industry sector, NACE code |
C19 - Manufacture of coke and refined petroleum products
|
|
Solar thermal system owner / operator |
China Petrochemical Corporation
|
|
Solar thermal engineering company |
SHANDONG LINUO PARADIGMA CO.,LTD
|
|
Process integration engineering company |
|
|
Year of operation start |
2022
|
|
|
Technical parameters |
|
|
Collector technology |
other or various collectors
|
|
Collector name |
|
|
Installed collector area (gross), m² |
3570.0
|
|
Installed collector area (aperture), m² |
3348.0
|
|
Installed collector area (absorber), m² |
4298.0
|
|
Installed thermal power (actual), kWth |
2283.0
|
|
Solar collector loop heat transfer fluid |
other (please specify)
|
|
Solar energy storage |
short-term water storage
|
|
Storage volume, m³ |
60
|
|
Kind of conventional heat source |
other
|
|
Kind of fuel used |
other
|
|
|
Process |
|
|
Solar thermal energy used for |
Used to heating the oil storage tank to increase the oil temperature and reduce the oil viscosity
|
|
Unit operation |
other process heating
|
|
Point of Solar Heat Integration |
B1) Heating of process(es) / process vessel(s)
|
|
--> Integration how and where |
|
|
--> Temperature range process |
50-70°C
|
|
--> Temperature range solar loop (min/max), C° |
15-90°C
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
738,834.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
602544
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
93250
|
|
Others (excl. VAT), € |
43039
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
not known
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
15
|
|
Annual useful solar heat delivery, MWh/a |
|
|
Specific annual useful solar heat delivery, MWh/am² |
|
|
Specific investment costs, €/m² |
206.96
|
|
Solar fraction, % |
70
|
|
|
Lessons learned |
|
|
Initiative |
The solar energy matches many thermal processes used in low and medium temperatures in industrial applications, which has supports for carbon neutralization.
|
|
Integration methodology |
The system of CPC tube collector combined with auxiliary electric heating system can provide hot water in temperature between 50℃ and 70℃stabilized. In daylight, the solar energy was collected in the system, while in night, the off-peak electricity was used to supply and storage heating.
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
Anti-settlement measures should be taken for hardening of site foundation and collector installation design to avoid leakage of equipment caused by foundation settlement.
|
|
Operation / Performance |
Anti-settlement measures should be taken for hardening of site foundation and collector installation design to avoid leakage of equipment caused by foundation settlement.
|
|
Recommendations |
|
|
|
|
|
|
|
|
|
|