General information |
|
|
Name |
HOTEL Solar Thermal for Wellness and Spa
|
|
Country installed |
Serbia
|
|
Address |
Avala Mountain Resort
|
|
Industry sector, NACE code |
Q - Human health and social work activities
|
|
Solar thermal system owner / operator |
Private
|
|
Solar thermal engineering company |
StorEnergy doo
|
|
Process integration engineering company |
StorEnergy doo
|
|
Year of operation start |
2018
|
|
|
Technical parameters |
|
|
Collector technology |
other or various collectors
|
|
Collector name |
StorE Mk6
|
|
Installed collector area (gross), m² |
30.0
|
|
Installed collector area (aperture), m² |
27.0
|
|
Installed collector area (absorber), m² |
0.2
|
|
Installed thermal power (actual), kWth |
24.0
|
|
Solar collector loop heat transfer fluid |
water/glycol
|
|
Solar energy storage |
short-term water storage
|
|
Storage volume, m³ |
8
|
|
Kind of conventional heat source |
other
|
|
Kind of fuel used |
other
|
|
|
Process |
|
|
Solar thermal energy used for |
Heat for Spa and Sauna
|
|
Unit operation |
general process heating
|
|
Point of Solar Heat Integration |
A3) Heating of supply heat storage
|
|
--> Integration how and where |
Integration with Storage tank via coil heat exchanger
|
|
--> Temperature range process |
50 C to 120 C
|
|
--> Temperature range solar loop (min/max), C° |
50/160
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
70,000.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
|
|
Others (excl. VAT), € |
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
no subsidies
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
25
|
|
Annual useful solar heat delivery, MWh/a |
26
|
|
Specific annual useful solar heat delivery, MWh/am² |
0.87
|
|
Specific investment costs, €/m² |
2333.33
|
|
Solar fraction, % |
30
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
|
|
Recommendations |
|
|
|
Source |
|
|
Author |
Marko Vuksanovic
|
|
Company of author |
StorEnergy doo
|
|
E-mail |
marko@solarbiro.rs
|
|
Phone |
00381654527895
|
|
Homepage |
https://storenergy.rs/en/home/
|
|
|
|
|
|
|
|
|
|