General information |
|
|
Name |
Bergen Solar
|
|
Country installed |
India
|
|
Address |
Gurgaon
|
|
Industry sector, NACE code |
C27 - Manufacture of electrical equipment
|
|
Solar thermal system owner / operator |
Bergen Solar
|
|
Solar thermal engineering company |
Bergen Solar Power & Energy Ltd.
|
|
Process integration engineering company |
Bergen Solar Power & Energy Ltd.
|
|
Year of operation start |
2012
|
|
|
Technical parameters |
|
|
Collector technology |
other or various collectors
|
|
Collector name |
Non imaging Concentrator
|
|
Installed collector area (gross), m² |
20.0
|
|
Installed collector area (aperture), m² |
20.0
|
|
Installed collector area (absorber), m² |
|
|
Installed thermal power (estimated), kWth |
14.0
(Default value calculated by multiplying the gross collector area by 0.7 kWth/m²)
|
|
Solar collector loop heat transfer fluid |
|
|
Solar energy storage |
|
|
Storage volume, m³ |
|
|
Kind of conventional heat source |
|
|
Kind of fuel used |
coal
|
|
|
Process |
|
|
Solar thermal energy used for |
integrated in existing process
|
|
Unit operation |
other process heating
|
|
Point of Solar Heat Integration |
B1) Heating of process(es) / process vessel(s)
|
|
--> Integration how and where |
|
|
--> Temperature range process |
|
|
--> Temperature range solar loop (min/max), C° |
120 - 140°C
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
6,570.36
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
|
|
Others (excl. VAT), € |
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
no subsidy
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
|
|
Annual useful solar heat delivery, MWh/a |
|
|
Specific annual useful solar heat delivery, MWh/am² |
|
|
Specific investment costs, €/m² |
328.52
|
|
Solar fraction, % |
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
Requires cleaning at regular time of interval to get better efficiency.
|
|