General information |
|
|
Name |
B.S. Paper Mill
|
|
Country installed |
India
|
|
Address |
Ludhiana
|
|
Industry sector, NACE code |
C17 - Manufacture of paper and paper products
|
|
Solar thermal system owner / operator |
B.S. Paper Mill
|
|
Solar thermal engineering company |
Taylormade Solar Solutions
|
|
Process integration engineering company |
Taylormade Solar Solutions
|
|
Year of operation start |
2011
|
|
|
Technical parameters |
|
|
Collector technology |
other or various collectors
|
|
Collector name |
Scheffler Dishes
|
|
Installed collector area (gross), m² |
160.0
|
|
Installed collector area (aperture), m² |
160.0
|
|
Installed collector area (absorber), m² |
|
|
Installed thermal power (estimated), kWth |
112.0
(Default value calculated by multiplying the gross collector area by 0.7 kWth/m²)
|
|
Solar collector loop heat transfer fluid |
|
|
Solar energy storage |
|
|
Storage volume, m³ |
|
|
Kind of conventional heat source |
|
|
Kind of fuel used |
biomass
|
|
|
Process |
|
|
Solar thermal energy used for |
For different process applications in the paper mill
|
|
Unit operation |
other process heating
|
|
Point of Solar Heat Integration |
C) Other integration points (please specify)
|
|
--> Integration how and where |
|
|
--> Temperature range process |
|
|
--> Temperature range solar loop (min/max), C° |
90 °C to 98°C
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
27,266.99
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
|
|
Others (excl. VAT), € |
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
10512,58
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
|
|
Annual useful solar heat delivery, MWh/a |
|
|
Specific annual useful solar heat delivery, MWh/am² |
|
|
Specific investment costs, €/m² |
170.42
|
|
Solar fraction, % |
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
Mirrors were damaged due to wear and tear. These have been replaced by unbreakable mirrors supplied by Taylormade Solar Solution Pvt Ltd recently. Now the functioning of the system is good.
|
|
Recommendations |
|
|
|
|
|
|
|
|
|
|