General information |
|
|
Name |
Golan Winery
|
|
Country installed |
Israel
|
|
Address |
Kazerin, Israel
|
|
Industry sector, NACE code |
C10 - Manufacture of food products
|
|
Solar thermal system owner / operator |
TIGI Solar
|
|
Solar thermal engineering company |
TIGI Solar
|
|
Process integration engineering company |
TIGI Solar
|
|
Year of operation start |
2015
|
|
|
Technical parameters |
|
|
Collector technology |
flat plate collector
|
|
Collector name |
TIGI HC1
|
|
Installed collector area (gross), m² |
244.0
|
|
Installed collector area (aperture), m² |
227.0
|
|
Installed collector area (absorber), m² |
227.0
|
|
Installed thermal power (actual), kWth |
246.0
|
|
Solar collector loop heat transfer fluid |
water/glycol
|
|
Solar energy storage |
short-term water storage
|
|
Storage volume, m³ |
30
|
|
Kind of conventional heat source |
hot water boiler
|
|
Kind of fuel used |
fuel oil
|
|
|
Process |
|
|
Solar thermal energy used for |
Barrel washing
|
|
Unit operation |
cleaning
|
|
Point of Solar Heat Integration |
A2b) Heating of supply line
|
|
--> Integration how and where |
|
|
--> Temperature range process |
85 deg C
|
|
--> Temperature range solar loop (min/max), C° |
up to 95 deg C
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
200,000.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
100000
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
25000
|
|
Others (excl. VAT), € |
35000
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
40000
|
|
Subsidy, € or % of total investment costs |
20%
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
20
|
|
Annual useful solar heat delivery, MWh/a |
212
|
|
Specific annual useful solar heat delivery, MWh/am² |
0.87
|
|
Specific investment costs, €/m² |
819.67
|
|
Solar fraction, % |
72%
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
|
|
Recommendations |
|
|
|
Source |
|
|
Author |
Zvi Klier
|
|
Company of author |
TIGI
|
|
E-mail |
zvika@tigisolar.com
|
|
Phone |
+972 52 6665443
|
|
Homepage |
www.tigisolar.com
|
|
|
|
|
|
|
|
|
|