General information |
|
|
Name |
Goess Brewery
|
|
Country installed |
Austria
|
|
Address |
Brauhausgasse 1, Leoben
|
|
Industry sector, NACE code |
C11 - Manufacture of beverages
|
|
Solar thermal system owner / operator |
Brauerei Göss
|
|
Solar thermal engineering company |
AEE INTEC, Arcon-Sunmark
|
|
Process integration engineering company |
AEE INTEC
|
|
Year of operation start |
2013
|
|
|
Technical parameters |
|
|
Collector technology |
flat plate collector
|
|
Collector name |
|
|
Installed collector area (gross), m² |
1520.0
|
|
Installed collector area (aperture), m² |
1375.0
|
|
Installed collector area (absorber), m² |
|
|
Installed thermal power (estimated), kWth |
1064.0
(Default value calculated by multiplying the gross collector area by 0.7 kWth/m²)
|
|
Solar collector loop heat transfer fluid |
water/glycol
|
|
Solar energy storage |
short-term water storage
|
|
Storage volume, m³ |
200
|
|
Kind of conventional heat source |
district heating
|
|
Kind of fuel used |
waste heat
|
|
|
Process |
|
|
Solar thermal energy used for |
mashing process
|
|
Unit operation |
other process heating
|
|
Point of Solar Heat Integration |
B1) Heating of process(es) / process vessel(s)
|
|
--> Integration how and where |
B1) integration in mashing process + A1) integration in make-up water
|
|
--> Temperature range process |
80-90°C
|
|
--> Temperature range solar loop (min/max), C° |
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
319,343.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
240908
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
61628
|
|
Others (excl. VAT), € |
16808
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
240908
|
|
Subsidy, € or % of total investment costs |
50%
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
|
|
Annual useful solar heat delivery, MWh/a |
|
|
Specific annual useful solar heat delivery, MWh/am² |
|
|
Specific investment costs, €/m² |
210.09
|
|
Solar fraction, % |
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
|
|
Recommendations |
|
|
|
|
|
|
|
|
|
|