General information |
|
|
Name |
Harlequin
|
|
Country installed |
Spain
|
|
Address |
Alhaurín de la torre-Malaga
|
|
Industry sector, NACE code |
C13 - Manufacture of textiles
|
|
Solar thermal system owner / operator |
Harlequin
|
|
Solar thermal engineering company |
GAROL
|
|
Process integration engineering company |
Soysur Alora S.L.
|
|
Year of operation start |
2002
|
|
|
Technical parameters |
|
|
Collector technology |
flat plate collector
|
|
Collector name |
GAROL I
|
|
Installed collector area (gross), m² |
47.15
|
|
Installed collector area (aperture), m² |
|
|
Installed collector area (absorber), m² |
|
|
Installed thermal power (actual), kWth |
33.0
|
|
Solar collector loop heat transfer fluid |
|
|
Solar energy storage |
short-term water storage
|
|
Storage volume, m³ |
5.0
|
|
Kind of conventional heat source |
|
|
Kind of fuel used |
|
|
|
Process |
|
|
Solar thermal energy used for |
|
|
Unit operation |
painting
|
|
Point of Solar Heat Integration |
A1) Heating of make-up water
|
|
--> Integration how and where |
|
|
--> Temperature range process |
|
|
--> Temperature range solar loop (min/max), C° |
|
|
|
Economic parameters |
|
|
Total investment costs (excl. VAT), € |
32,942.00
(Turnkey costs including solar collectors, piping, support construction, storage, design, commissioning reduced with subsidies)
|
|
Solar loop (excl. VAT), € |
(Solar collectors, piping, support construction)
|
|
Solar energy storage (excl. VAT), € |
|
|
Others (excl. VAT), € |
(Design, commissioning, others)
|
|
Process integration (excl. VAT), € |
|
|
Subsidy, € or % of total investment costs |
no information available
|
|
Cost for fuel replaced, €/MWhfuel |
|
|
Calculated solar thermal system life time, a |
|
|
Annual useful solar heat delivery, MWh/a |
42
|
|
Specific annual useful solar heat delivery, MWh/am² |
0.89
|
|
Specific investment costs, €/m² |
698.66
|
|
Solar fraction, % |
68
|
|
|
Lessons learned |
|
|
Initiative |
|
|
Integration methodology |
|
|
Crucial Interfaces |
|
|
Construction / Commissioning |
|
|
Operation / Performance |
|
|
Recommendations |
|
|
|
|
|
|
|
|
|
|